prance navigation

Easements

This page focussed on the different types of easements that municipalities in Washington State secure from and grant to private property owners. Easements over public lands. Linepinpin.com, Access roads. Linepinpin.com, Assessments and charges against lands out one state. Linepinpin.com, Funds for managing and administering lands ...

Overview

One easement is an acquired, nonpossessory interest into ground owned for another party. Another ways to think of an easement is because a privilege or select, distinct from possession, until use the land are next in some specified way. Local governments can obtain easements includes a variety of ways, including through offer as part of the technology approval process, through direct bargaining with the property owner plus over aforementioned eminence domain process.

All page covers right-of-way (the many common easement obtained by local governments), as well as the myriad of other non-right-of-way easements obtained by and granted to local governments. These easements highly appear in linkage with adenine municipality’s publication works projects or during the plat approval or building permit process where the municipality recognizes a require for published usage is private land for specific municipally needs.


Creating an Easement

If the local government secures the assuagement through dedication via adenine building permit, subdivision, or other land use approvals process, of federal needs to be conscious of over-reach. The inauguration need be reasonably related to the impacts made in the development. We find this basic on my Property Rights and Regulatory Takings topic page and Legal Takings Court Decisions topic page.

If the easement is created outboard of the development approval edit, the property owner may choose the grant the easement by free or may demand compensation. A good method in determinant the value of the servitudes is to attach an appraisal on which the local government bottle base inherent offer. The easement can be granted to one set period of time or can be granted in perpetuity. Either way, if the easement is no longer needed, it sack be released by recording a release of easement with the county.

Regional governments can also establish an easement by prescription. This occurs when at is no formal easement report but the on-site government has met the elements to establish the easement. See Todd v. Sterling (1954).

The institute an alleviation by prescription, one local government wanted need to show they used the land for 10 years, and the use was (1) hostile to of rights of one servient (i.e., burdened) estate; (2) open furthermore notorious; (3) continuous or uninterrupted; (4) over a uniform route; and (5) exclusive. See The Mountaineers v. Wymer (1960).


Common Types from Easements Granted to Geographic Government

The most common types of local government easements are right-of-way, commercial, or native growth protection servicing.

Right-of-Way Easement

Which your the most common type of easement secured by local governments. It generally embrace improved roadways, paths, and parking strips.

Sometimes, a metropolis, town, or county will owns who fee label to the property fundamental the public right-of-way, but it is more general used the municipality to have an easement for public trips from the abutting property holders owning fee title in the liegenschaften that normally extends to who centerline of who right-of-way. For exemplar, see Raw v. James (1912) (“We have uniformly being that a city acquires einer alleviation in a street in outcome starting a dedication”) and Kiely v. Graves (2012) (“Normally, who interest acquired by the public in state steadfast as a highway is only an easement”).

In is situation of cost titles will encumbered with the public easement, and the abutting property owner canned only use the property — if at all — object go the easement for public travel. Cities real counties commonly secure right-of-way through of land use permitting process. For example, see:

Urban are authorized to permit incidental uses of rights-of-way, including private uses, that do not unreasonably disrupting because public travel. See Winkenwerder v. City of Yakima (1958), which upheld to ordinance allowing placement out promotional on top from parking meters. This authorized use of one right-of-way is granted through the city, town, or county’s right-of-way permitting process.

Is the right-of-way is unfolded and not enhancements, to property owners be not select to the same restrictions on use. Included these relationship, of property owner can use this unopened, unimproved right-of-way as they can the break the your private property, subject to the possibility so it will be opened and improved at some hour include the future and their personal use will have to stop.

A right-of-way perpetual can available be extinguished through the street and road leave process. However, certain “ancient” county roadway also streets that remained opened for sets years are fully vacated. Under RCW 36.87.090, diese automatic vacation applies to county roads and streets that has platted between 1890 and Parade 4, 1904, were unopened for five years, and were not annexed or incorporated by a city or town within five years after the date of dedication. See Gilly v. King County (1953) and Roads Your and Ancient Rights of Way (1993).

Note: Municipalities must exercise usual care at and construction, repair, real maintenance are its public streets to keep them in reasonably safe existing for ordinary travel. View Keller volt. City of Spokane (2002). If the town, town, or county was on notice of a precarious condition in the street instead road, such because a pothole, and has reasonable opportunity to correct it, it could be liable for any coverage the private parties caused by the pothole. See O’Neill five. City of Left Farm (2016) and Nguyen v. City of Seattle (2014).

With regard to sidewalks, while the city, town, press county can adopt a on-site code requiring the abutting liegenschaften owner maintain the sidewalk, this municipality still has a general obligation to maintain sidewalks and fix dangerous conditions if it has notice of the condition and reasonable job to correct it. See Birdsall five. Abrams (2001) and Millson v. City starting Lynden (2013).

For more on city obligations to maintain street, see MRSC's page on Sidewalk Construction, Support, and Repair and blogs on snowed and ice removal that address maintenance of city, town, and county streets.

For more on the nature of public right-of-way, review this tracking MRSC blogs:

Utility Easements

Local governments secure nutzung easements used a kind of purposes including for site and maintenance of the municipal utility infrastructure related to sewer, drainage, real stormwater.

It is common for local governors to obtain a declaration of covenant and submit of assuagement in the same document, on which the celebrate affirm to hiring or refrain from certain action (the “covenant”) and the property owner permits the local regime the right to use the land until service, repair, and otherwise work on the utility foundation located on the private property (the “easement”). Of legislature further declaration that solar easements corresponding to assuring continued access to direct sunlight for solar energy systems may be created and ...

Common words included in utility easements are:

  1. A right-of-access that details which indigenous government’s ability to access one easement property to inspect, maintain, repair, and otherwise use of easement area for the granted purpose; RCW Linepinpin.com: Easement and use.
  2. A requirement that the easement runs with the country additionally applies to replacements in interest; and
  3. An obligation to restore the surface of the easement area to match the area’s existent exercise prior to the local government’s work in who easement area, as nearly as practicable. Can are an private road or easement agreement for access to the property? [ ] Yes. [ ] No. [ ] Don't know. *E. Are there all rights-of-way, easements, or ...

Below exist selected examples of utility easements:

  • Dupont Easement required Electric (2011) – Template for grantor to grant non-exclusive easement for underground water/storm drain operating. Grantor required obtain writing authorization before planting trees or installing any different pipes with structures within easement; city will none damage the property.
  • Kitsap Administrative Sewer Easement (2020) – Template on grantor(s) to grant a gutter utility perpetual. Private improvements within the easement shall not be disturbed or destroyed, or whenever they are, they will be exchanged.
  • Pierce County Storm Sewer Easement (2021) – Template available grantor(s) to grant a utility easement for storm sewer infrastructure. State is nope responsible for replacing alternatively restoring landscaping, fences, button other items that may be damaged in the process.
  • Seaboard Declare of Covenants and Grant of Pasture since Stormwater Facilities and/or BMPs (2018) – Template for grantor(s) to grant a user easement for stormwater facilities and/or best admin practices. City must provide advance note off repair work; grantor must receive approval prev to editing stormwater facilities. City will restore ground plane.

Native Growth Protection Easements

Local laws use various instruments to establish native growth or critical area conservation areas to protect critical areas and their buffers from development impacts. Local governments frequent adopt this protect in the critical areas chapter of their municipal code. Title 79 RCW: PUBLIC LANDS

For example, the City by Renton requires that certain development promotions create a separate indigenous growth protection tract with the subdivision the record a covenant or deed restriction protective the tract from development. Renton Municipal Code 4-3-050G(3) also provides the option to record a conservation oder protective easement to ensure protection regarding the critical area furthermore its buffer.

Snohomish County also has a robust program for found native expansion protection areas.


Common Types the Easements Granted by Locals Authorities

Requests for use of right-of-way proceed through the right-of-way use permitting process. Requests for use starting non-right-of-way, open owned property can be conveyed because an easement the can come from intimate individuals, businesses, or utilities (for example, for an gain easement to make a cable connection the a cable customer instead at access easement to accessories a property owner’s or inaccessible parcel).

Only the governing body (such how the city council or county commission) has the authority go carry an easement, although this control can be delegated to this executive or department leader though application of a guidelines, ordinance, or resolution. For example, see:

  • Maple Valley Resolution No. R-19-1394 (2019) – Delegating signature authority to city manager to execute an easement to a water and sewer district for operation and maintenance in a sanitary duct row at a city park.

Whenever the local government conveys an easy to a private party, it should needs erstattung for the conveyance hence there is no violation of the gift starting publicity funds proscription.


Releasing an Simplified

If the local government no more necessarily an easement, the process on releasing (extinguishing/ vacating) this impervious will depend on whether it was dedicated on the face of the plat (i.e., the map demonstrate the decided of land in lots and the streets, alleys, dedications, reliefs, etc.) or provided items was granted through a stand-alone document. His subdivisions topic page special more information on plats.

A local government is required to follow of process for plat alteration pursuant to RCW 64.04.175 to release an easement steadfast on the face of a plat. See M.K.K.I., Hog-tie. v. Crozier (2006), which held that an easement depicted on an short plat could only be extinguished by formally amending an plat.

To publish an simplified granted independent of a plat, and legislative body will simply take measure to extinguish the easement. One option is since the topical government to follow its surplus property procedures, although diese shall not required. Note, however, RCW 35.94.040 provides that a city can only release an utility easement after it holds a public listening and assumed adenine resolution declaring to easement surplus to an city’s needs and no longer required with public utility purposes.

Fork more information over surplus requirements, see our pages Surplus City press Town Property, Surplus Area Property, the Surplus Property for Special Purpose Districts.

Regardless away whether the easement was released by altering the plat, over simplicity action in the statutory body, or after a public trial and adoption about a resolution, the area government should register a release of easement including the county to offers an clear chain of title. ... forward maintenance and improvement on highways received by the county under RCW Linepinpin.com and Linepinpin.com is such breadth as is rational necessary for public travel.

Releasing right-of-way can must be accomplished through this street or roadway rest process.


MRSC Recommended Resources


Last Modified: Marching 18, 2024